Current Projects
-
Children's Hospital MRI
Removal of an existing MRI and rebuild of the suite, MEP, shield, installation of the MRI, and associated equipment.
-
OUH IR 6 & 7
Construction of 2 Interventional Radiology rooms sharing a common control room within an existing space.
-
OUH ED CT
Phased construction of a CT room and Rad room in an active ED.
-
Children's Hospital Blood Bank
Construction of a 2,500 SF blood lab.
-
Integris 2N 3N
Finish and MEP upgrade to two wings. Includes 38 patient rooms as well as common spaces and support areas.
-
Hillcrest Infusion
340B compliance upgrades in phased construction within operating infusion clinic.
-
Mercy MRI
MRI Upgrade includes modification to shield, MEP, equipment room. Magnet core was ramped down, protected and remained in place throughout the entire project.
-
McAlester Cancer Center
340B compliance upgrades, preparation and installation of a CT Sim, and Varian linear accelerator.
Past Projects
-
OU HSC Tulsa Infusion
340B Compliance upgrades and renovation of the space to accommodate a new infusion clinic.
-
Stephenson Lab
Modifications and expansion of the blood lab and associated clinic space. Included preparation and installation of new blood analyzers as well as casework within an operational lab.
-
Stephenson Radixact
Removal of an existing Varian linear accelerator. MEP, structural, and architectural modifications to prepare the space for a Radixact linear accelerator.
-
Stephenson LINAC 3
Removal of an existing Varian linear accelerator. MEP, structural, and architectural modifications to prepare the space for a new Varian linear accelerator.
-
Stephenson LINAC 2
Removal of existing Varian linear accelerator. MEP, structural, and architectural modifications to prepare space for a new Varian linear accelerator.
-
OU Histology
Phased 6000 SF renovation of an occupied histology lab.
-
Children's CCN Conversion
Conversion of an 8,000 SF ICU to a Critical Care Nursery
-
Mercy Health Ada Generator
1 MW generator install including ATS and associated switchgear.
-
Mercy OB Renovation
Construction of 3 new LDRP rooms within operational OB unit.